This allows for those of us who design to both American and International standards to switch back and forth between projects without the need to change global settings within the software. Instead, you have to manually change each device.am I missing something?ĪutoCAD Electrical allows you to define each project to use specific rules, symbol libraries, etc. Is there a way to change ALL the devices under an Install or Location Code in the Project Manager to a new / different Install or Location code? This function is so obvious to me but the hooks don't seem to be there. I am liking this Location View as it is similar to ePlan (IEC) format. Am I missing something? It is automatic in ePlan to assign the sheet codes to devices on that page.Īlso, the Location View in the project manager is new since I used ACADE prior to switching to ePlan. If I assign an Install Code and Mounting Code to a sheet, why when I place a device on that sheet it doesn't automatically get assigned the codes? The idea that I have to manually assign each component when the sheet has the codes is redundant. Now I understand the idea and use of Installation Code and Location Code from ePlan. I have used ePlan for the last 5 years or so and am now back using AutoCAD Electrical again.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |